DN600 MSCL Water Distribution Main, Scotch College
Civil Infrastructure
Project Type / Category
More Projects
End Client
Scotch College
Contractor
Wormall
Project Value
$500k
Project Location
Shenton Road, SWANBOURNE WA 6010
Project Completion
June 2013
Value Engineering Solution
- Lower Water Main - Shallow Underpass.
- Minor Road Works - Maintain Pipe/Fixture Alignment.
To facilitate the construction of the underpass between the campuses of Scotch College, service infrastructure had to be relocated and reinforced.
In the case of the Water Corporation’s reticulation and distribution mains, they were deflected under the future footings of the proposed underpass.
Pritchard Francis negotiated the commission design outcome with the Water Corporation then superintended these works as part of Underpass Contract.
Works were undertaken over an extended long weekend allowing a reduction in school based traffic.